Deethanization gas treatment unit at Urengoy Condensate Pre-Transportation Preparation Plant

Project photo and video
About the project
In 2016 Gazprom Pererabotka LLC began the process of reconstruction and construction of new production facilities at Urengoy Condensate Pre-Transportation Preparation Plant. The plant's products are deethanized gas condensate sent for further processing to the Surgut Condensate Stabilization Plant (CSP), diesel fuel, stable gas condensate, liquefied gas, broad fraction of light hydrocarbons, gas condensate distillate and dry gas.
Performed works
scroll below
13,7
million tons of unstable gas condensate per year — design capacity of the plant
By clicking the "Submit" button, I accept the Policy and give the submission of my personal data for processing

Performed works
Development of design and working documentation
APCS, ACSPS, MAESM, ESMS, industrial electric heating system, ACSEFG, FEQCS
May 2015 — October 2018
Production
ACSEFG, FEQCS
August 2018
Supply
APCS, ACSPS, MAESM, cable products, MMTS, CDS, metering stations, I&C, SOCV, fire alarm system, ESMS, industrial electric heating system
October 2016 — July 2018
Performing CAW and commissioning
I&C, APCS, ACSPS, MAESM, ESMS, electrical equipment, industrial electric heating system
April 2018 — to the present day
Maintenance
Electrical equipment and networks
March 2019 — to the present day
Complex for production, storage and shipment of liquefied natural gas near the Portovaya CS
Project photo and video
About the project
A new complex of engineering facilities is designed to receive raw gas, prepare gas for liquefaction, liquefy natural gas, store and shipment. It is located in the Vyborg district of Leningrad region, on the north-eastern coast of the Gulf of Finland.
Performed works
scroll below
45
different buildings and structures within the complex
1,5
million tons per year of LNG — planned plant capacity
By clicking the "Submit" button, I accept the Policy and give the submission of my personal data for processing

Performed works
Development of design documentation sections
ACS PS, MAESM, industrial electric heating system, IAPCS
November 2016 — September 2018
Development of working documentation sections
Industrial electric heating system, ODMS, ACS PS, IECS, CS, ITV, CCL, RC, APCS MPF
May 2017 — May 2019
Production
Analyzer complex, switchboard equipment, heated I&C cabinets, ACSEFG, ACSVC, industrial electric heating system
May 2018 — to the present day
Shipment
Automation and power supply system, industrial electric heating system, electrochemical protection, Substation 110/10-MYS, ventilation and heating system
September 2017 — to the present day
Performing CAW and commissioning
Automation and power supply system, ventilation and heating system, industrial electric heating, electrochemical protection, metrological support, Substation 110/10-MYS, ACSEFG, ACSVC
September 2017 — to the present day
Maintenance
Electrical equipment and networks
June 2019 — to the present day
Condensate stabilization unit at Achimov deposits in Nadym-Pur-Tazovsky region
Project photo and video
About the project
Condensate stabilization unit at Achimov deposits in Nadym-Pur-Tazovsky region is one of the priority courses of the investment program of Gazprom PJSC. According to the company, the design capacity of the facility will produce about 4 million tons of deethanized condensate per year, and will ensure the reception and transportation of the entire amount of oil produced in the region.
Performed works
scroll below
4
4 million tons of deethanized condensate per year
By clicking the "Submit" button, I accept the Policy and give the submission of my personal data for processing

Performed works
Production
Equipment and materials for the industrial electric heating system, APCS, ACSPS, MAESM, AFAFFS, CTC, SVPAC
February 2018 — June 2019
Supply
Block-configuration equipment (CDS, MMTS, MPEPP), I&C, SOCV, cable products and cable tray systems (CTS), video surveillance and communications
January 2017 — to the present day
Performing CAW and commissioning
Installation and power cable, AFAFFS, ACS PS, telemechanics, SVPAC, I&C, APCS, MAESM, CTC, SOCV, CTS, video surveillance and communications, electrical equipment
March 2018 — to the present day
Maintenance
Electrical equipment and networks
January 2019 — to the present day
Reconstruction of the booster compressor station at Urengoy Condensate Pre-Transportation Preparation Plant to provide feedstock for NGCC
Project photo and video
About the project
In 2016 Gazprom Pererabotka LLC began the process of reconstruction and construction of new production facilities at Urengoy Condensate Pre-Transportation Preparation Plant. The plant's products are deethanized gas condensate sent for further processing to the Surgut Condensate Stabilization Plant (CSP), diesel fuel, stable gas condensate, liquefied gas, broad fraction of light hydrocarbons, gas condensate distillate and dry gas.
Performed works
scroll below
13,7
million tons of unstable gas condensate per year – design capacity of the plant
By clicking the "Submit" button, I accept the Policy and give the submission of my personal data for processing

Performed works
Development of design and working documentation
APCS, ACSPS, MAESM, ESMS, industrial electric heating system
May 2015 — October 2018
Production
MAESM
May 2017
Supply
APCS, ACSPS, cable products, MMTS, CDS, metering stations, I&C, SOCV, fire alarm system, ESMS, industrial electric heating system
September 2016 — April 2018
Performing CAW and commissioning
APCS, ACSPS, ASEPTM, I&C, AFAGHM and FFS, MAESM, ESMS, AMCS, electrical equipment, industrial electric heating system
April 2018 — to the present day